- FIELD 40000 (4 ha) square m in Giurgiu, 500 m opened to the Danube River (Plants Channel):
- TERMINAL for loading/unloading into/from river barges, 13 silos X 400 tones capacity each, equipped with unloading ramp for rail and LKW, mixed cleaner (both mechanic and pneumatic), grain dryer, weighing system on the flux, transporter to the silos and platform by both ways conveyor belt into/from barges, new, TORNADO – GERMANY brand, all programmed for 100 tones grain or meals/hour;
- pontoon to the Danube river, 37 m x 8 m, for the barges touch and service;
- 1 ha. (10000 square meters) industrial LAKE;
- GRAIN STORAGE FACILITY – capacity 30’000 TONES , 100m x 50 m x 25 m, 2 entrances, inside rail and discharging ramp;
- ELECTRIC CONNEXION STATION 6/20 KV with 2 transformers (PT 4 and PT8);
- 6 km de railway inside the courtyard and stores;
- Industrial STORAGE, new construction, 70m x 40m, not used and unfinished;
- field prepared for a construction 200m x 80 m, having the piles already built;
- 2 DRAUGHT CILINDERS 40 m diameter, with a collector channel communication, which is running to a tank (size 50m x 40m x 8 m) having splitting walls labyrinth type;
- 2 ELECTRONIC WEIGHING MACHINES, PHILIPS brand, for rail wagons 100 t capacity and road trucks 40 t capacity;
- BUILDING 100m x 50m x 29 m, former Thermal Power Plant;
- BUILDING 100m x 50 m, having installed the oil factory (presses and the facility for refining, filtering, bottling etc), also provided with celery and conveyor bridge for 100 tones;
PRICE: 17’000’000 Euro
REMARK: The price is taking into consideration the position across the DANUBE river opened along 500 meters and not the surface on the ground !